Công Trình/ Project: CÔNG TY TNHH HI KNIT/ HI KNIT CO.,LTD
Phần việc/ Items: LẮP ĐẶT HỆ THỐNG ĐƯỜNG ỐNG VÀ CẤP NGUỒN CHO MÁY TENTER SỐ 8/ INSTALLATION OF PIPING SYSTEM AND POWER SUPPLY FOR TENTER MACHINE NO.8
Địa điểm/ Location: KCN NHƠN TRẠCH 6, XÃ LONG THỌ, HUYỆN NHƠN TRẠCH, TỈNH ĐỒNG NAI/ NHON TRACH 6 IP, LONG THO COMMUNE, NHON TRACH DISTRICT, DONG NAI PROVINCE.
Investor: Sewang Vina co.,ltd Items: Construction of factory pipe system Location: Bau Bang ip, Bau Bang dist., Binh Duong province
Tan An Commune, Vinh Cuu District, Dong Nai Province. Client: DONG VIET AGRICULTURAL JSC Area: 98.000 m2 Scope of work: Construction Of Rain Drainage System, Wastewater Drainage System, Traffic (Background, Surface, Sidework, Traffic Signal) Power...
Công Trình: CÔNG TY TNHH HI KNIT Phần việc: XÂY DỰNG XƯỞNG NHUỘM 2 TẦNG 65 x 80M Địa điểm: KCN NHƠN TRẠCH 6, XÃ LONG THỌ, HUYỆN NHƠN TRẠCH, TỈNH ĐỒNG NAI