LẮP ĐẶT HỆ THỐNG ĐƯỜNG ỐNG VÀ CẤP NGUỒN CHO MÁY  TENTER  SỐ 8 – HI KNIT



Chi tiết dự án

Công Trình/ Project:  CÔNG TY TNHH HI KNIT/ HI KNIT CO.,LTD

Phần việc/ Items:  LẮP ĐẶT HỆ THỐNG ĐƯỜNG ỐNG VÀ CẤP NGUỒN CHO MÁY  TENTER  SỐ 8/ INSTALLATION OF PIPING SYSTEM AND POWER SUPPLY FOR TENTER MACHINE NO.8

Địa điểm/ Location: KCN NHƠN TRẠCH 6,  XÃ LONG THỌ, HUYỆN NHƠN TRẠCH, TỈNH ĐỒNG NAI/ NHON TRACH  6 IP, LONG THO COMMUNE, NHON TRACH DISTRICT, DONG NAI PROVINCE.




Dự án liên quan

SEWANG KYUNGBANG PIPING SYSTEM

Investor: Sewang Vina co.,ltd Items: Construction of factory pipe system Location: Bau Bang ip, Bau Bang dist., Binh Duong province

TAN AN RESIDENTIAL INFRASTRUCTURE BY PLANNING

Tan An Commune, Vinh Cuu District, Dong Nai Province. Client: DONG VIET AGRICULTURAL JSC Area: 98.000 m2 Scope of work: Construction Of Rain Drainage System, Wastewater Drainage System, Traffic (Background, Surface, Sidework, Traffic Signal) Power...

CÔNG TRÌNH XÂY DỰNG NHÀ XƯỞNG NHUỘM CÔNG TY HI KNIT

Công Trình:                  CÔNG TY TNHH HI KNIT Phần việc:                     XÂY DỰNG XƯỞNG NHUỘM 2 TẦNG 65 x 80M Địa điểm:                       KCN NHƠN TRẠCH 6, XÃ LONG THỌ, HUYỆN NHƠN TRẠCH, TỈNH ĐỒNG NAI